100+ MW Deployable | 12 Months to Operation | $0.04 LCOE/kWh
Delaware C-Corp · NVIDIA Inception Program · DSX AI Factory Architects
Sovereign Fuel.
Sovereign Power.
Sovereign Compute.
SovAI builds behind-the-meter AI power infrastructure for hyperscalers, neoclouds, sovereign compute programs, and DSX AI Factory operators — end-to-end, from three-pillar framing to intelligent compute.
12 Months
No grid
queue
Fully
orchestrated
Carbon
attested
One platform. Three sovereignties.
BYOF
Fuel from feedstock, on your terms.
Learn more →
BYOP
Generation outside the utility queue.
SovGEN, SovSTOR, SovGRID, and SovCOOL integrated behind the meter — orchestrated by Scotty and delivered as a factory-grade power platform. 12 months to energization, versus a 44-month average interconnection queue.
Learn more →
BYOC
Sovereign silicon on sovereign power.
NVIDIA DSX AI Factory destinations delivered through our SHI International channel — NVIDIA Vera Rubin and Blackwell systems sited on behind-the-meter power that is dispatchable, carbon-improved, and operationally independent from the grid.
Learn more →
Three pillars, one platform. SovAI builds, operates, and orchestrates behind-the-meter AI infrastructure end-to-end.
The platform
Four integrated systems. One orchestration AI.
SovGEN
US-made EMD 16-710 2-stroke V16 locomotive RICE engines, converted and containerized for behind-the-meter primary power generation.
100+ MW
SovGRID
Point-of-interconnection switchgear, protection, relaying, and substation-grade grid services for behind-the-meter sites with optional export capability.
IEEE 1547
SovSTOR
Hybrid semi-active supercapacitor and LFP battery system on an 800V DC bus. Sub-millisecond transient response, frequency-agnostic input.
<1 ms
SovCOOL
Liquid-cooling and waste-heat recovery platform engineered for AI-factory thermal loads. Sole-inventor provisional patent, Joe D. Doyle.
ASHRAE
All four systems orchestrated in real time by Scotty / DOE — the Dispatch Optimization Engine.
The proof
Partners who build at scale.

NVIDIA
Inception Program member · DSX AI Factory Architects & Engineers

SHI International
$16B enterprise channel · GPU procurement & compute EPC partner

WattTime
Grid carbon intensity · NZe certification and carbonstamp attestation
44 mo
12 mo
Projects in flight across Michigan and New Jersey, with a 18-36 months grid gap we are closing today.
Competitive Advantage
The only company combining rapid deployment, grid independence, and carbon-negative operations.
| Capability | Grid-Dependent DCs | SMR Companies | SOVAI |
|---|---|---|---|
| Deployment Speed | 18–36 months | 5–7+ years | 12 months |
| Grid Independence | ❌ None | ❌ Mostly grid-tied | ✅ 100% BTM |
| Revenue Streams | 1 (compute) | 1 (power) | 7+ streams |
| Carbon Profile | Grid-dependent | Clean but slow | Carbon-negative |
| Supply Chain | Foreign dependencies | Foreign components | domestic supply chain pathway; engine sourcing varies by project |
| LCOE | $0.08–0.15/kWh | Unknown (no units) | $0.04/kWh |
| Debt Position | $10B+ leveraged | Heavy CapEx | Zero legacy debt |
Behind-the-meter power. 12 months. No queue.
Your GPUs are ready.
Your utility queue isn't.
We respect your privacy. Please do not include confidential technical details in your message.